Zoom Logo

Hartford Downtown Study Design Workshop Pinup Session #1 - Shared screen with speaker view
Rebecca Lurye
07:47
yes, happy to be covering
Mike Rutkowski
10:02
TY Rebecca!
John Gale
36:31
Thumbs up
John Gale
39:25
Pedestrian safe zone north of Buckingham is on the wrong side of Main street, if I am understanding the design. The extended space which people presently use and would use is on the west side.
John Gale
40:11
What are white areas?
John Gale
47:23
Thumbs up
Kevin Chick
48:16
Have you looked at eliminating Main street to the west of Barnard Park?
Kathleen Maldonado
50:01
sorry didn't mean to rIse hand
Kevin Chick
51:35
Thank you - narrowing would help
Peter Walsh
51:59
This street has been the center of Hartford since the beginning in the 17th century and there are pieces surviving from each century since. is there a way of connecting the street with it past and the many events that have taken place there?
Philip Shattuck
54:48
In the peanut roundabout - have fully signalized crosswalks been considered? Just thinking about all the traffic that does move through there slimming to single lines. Driver behavior down there would not make me very bold to walk into a crosswalk and expect drivers to stop often enough to make walkability a great success there
Bonnie Matthews
59:08
I'm wondering why this project does not go the rest of the way up main street to Morgan St. To completely cover downtown Main St
Bahman Moghimi
59:29
In terms of transit priority and traffic point of view, it is mostly better to make bus-stop location be far-side (to be located after the intersection) rather than near-side. Far-side stop function better with transit signal priority. It would be good to have this approach in your concept design, and try to make it happen as much as you can.
Peter Walsh
01:02:04
There’s a lot going on along this street and just off it that is not obvious to people passing by. is there a way of showing people from the street what is going on in the library, the museum, the courts, the offices, and other buildings along this route?
Kathleen Maldonado
01:04:13
Albany ave is getting some work and also not all the way
Kathleen Maldonado
01:05:32
I wish they were more generous,,, Albany ave from center st south to main st should be done as well.. main to Morgan brings the stadium altogether w the nkrthend
Philip Shattuck
01:09:15
Does CTtransit have a preference in terms of design at the hub?
Kathleen Maldonado
01:10:02
thanks sandy
John Gale
01:13:09
Two thumbs up!
Anne Hayes
01:14:12
Thanks everyone!
John Gale
01:14:12
Thanks all of you.